top of page

Search Results

214 items found for ""

  • Northwestern Mutual Office Buildings Commons | DAAR Engineering Inc

    Northwestern Mutual Office Buildings Commons Client Kyle Merrill Gilbane, Inc. Location Milwaukee County, WI Total Estimated Cost $450 Million The Northwestern Mutual (NM) Tower and Commons was built in downtown Milwaukee and has an estimated 1.1 million square feet of office, retail and meeting space. The 32-story tower (approximately 550 feet tall) is the second-tallest building in Milwaukee. The project preserves 1,100 downtown jobs while adding 1,900. With its proximity overlooking the Lake Michigan shore, the development has become an instant Milwaukee landmark. The new tower was completed in August 2017. DAAR's surveyors responsibilities included: • Placement of the building on-site • Establishing horizontal and vertical control lines and benchmark floor by floor • As-built existing conditions • Coordination between the design team and contractor • Quality control. Project Gallery 1/1 < Previous Project Next Project >

  • ALTA-NSPS Land Title Surveys | DAAR Engineering Inc

    ALTA-NSPS Land Title Surveys An ALTA/NSPS Land Title Survey is a specialized survey used in commercial real estate transactions in the United States. It adheres to strict standards set by the American Land Title Association (ALTA) and the National Society of Professional Surveyors (NSPS). This comprehensive survey provides essential data on property boundaries, structures, easements, and more, helping ensure smooth, secure transactions and supporting title insurance assessments for commercial properties. DAAR Engineering offers survey services statewide and has become the leading direct provider of ALTA Land Title Surveys. Working alongside Title Insurance companies, attorneys, lenders and developers to provide an accurate ALTA land survey map for all of our clients. Featured Projects < Previous Next Project >

  • william-anderson | Daar Engineering, Inc.

    Will Anderson Project Manager william.anderson@daarcorp.com 414-225-9817 ​

  • Land Development Survey | DAAR Engineering Inc

    Land Development Survey DAAR’s surveyors are recognized in the industry as the most reliable and well-trained in the field today. We have been part of the core team on some of Wisconsin’s most high-profile projects. Our services range from individual property surveys to sub-division layouts to small retail developments to large scale commercial construction projects. No project is too big or too small. Featured Projects project9 Read More project17 Read More < Previous Next Project >

  • Design Services | DAAR Engineering Inc

    Design Services For the past two decades, DAAR has offered transportation design services for clients both domestic and overseas. Our team is composed of experienced project managers and technical staff that bring a wealth of expertise to any project. DAAR’s award-winning work has been recognized universally as some of the best in the industry. Featured Projects < Previous Next Project >

  • jacob-fehring | Daar Engineering, Inc.

    Jacob Fehring Project Engineer jacob.fehring@daarcorp.com 414-225-9817 ​

  • frederick-koth | Daar Engineering, Inc.

    Frederick Koth Engineer I frederick.koth@daarcorp.com ​ ​

  • mike-novey | Daar Engineering, Inc.

    Mike Novey, P.E. Construction Services Manager/Principal mike.novey@daarcorp.com 608-566-1370 Mr. Novey, who leads the Wisconsin construction division at DAAR Engineering from our Portage office, serves as the Construction Services Manager/Principal. With over three decades of experience in transportation design and construction, Mike has a wealth of expertise in project problem solving, consultant solicitations, contract negotiations, and project management. Mike is a licensed Professional Engineer in Wisconsin. Mr. Novey's extensive background encompasses the administration of numerous large and small-scale projects. He excels in tasks such as reviewing plans for constructability, staging, and bid feasibility, while diligently monitoring project budgets and schedules. Furthermore, Mike provides invaluable guidance and mentoring to our staff, maintains excellent client relations, prepares pay estimates, handles construction layout, oversees construction inspection, manages on-site plan revisions, ensures construction supervision, and upholds rigorous quality assurance standards. His strong public relations skills facilitate seamless coordination between utilities, consultants, government agencies, and private citizens. Residing in Pardeeville, WI, Mike is a devoted family man, happily married with three adult children. Outside of work, he finds joy in exploring the great outdoors, indulging in his passion for hiking and biking across the picturesque state of Wisconsin.

  • WIS 23 Freeway Designation and Corridor Preservation Study | DAAR Engineering Inc

    WIS 23 Freeway Designation and Corridor Preservation Study Client Wisconsin Department of Transportation (NE Region) Location Sheboygan County, WI Total Estimated Cost $73.6 Million Transportation Planning services were preformed for this project to identify the existing and anticipated future roadway conditions along the WIS 23 Corridor from County P (Plymouth) to WIS 32 (Sheboygan Falls). Wisconsin State Highway 23 serves as a main thoroughfare between Fond du Lac and Sheboygan. As the communities along this segment of roadway continue to grow and develop, traffic and demand for access to businesses and residences along it will also increase. A comprehensive public involvement plan was developed, including: • Public information meetings • Local official meetings • Newsletters • One on one meetings with property owners In addition, a stakeholder committee consisting of local officials, business community representatives, agricultural interests and community planners was assembled to provide input on the project plans from a local perspective. Project Deliverables: • Analysis of existing and future conditions • Development of alternatives and official corridor mapping • Alternative selection and final recommendations • Preliminary engineering and environmental assessment Project Gallery 1/1 < Previous Project Next Project >

  • Becher Street Reconstruction | DAAR Engineering Inc

    Becher Street Reconstruction Client City of Milwaukee DPW Location City of Milwaukee, WI Total Estimated Cost $1.1 Million DAAR provided design services for the reconstruction of Becher Street near the Kinnickinnic River on the south side of Milwaukee. The accelerated urban reconstruction design included a roadway diet in which a 4-lane divided roadway was converted to a 3-lane TWLTL section. The project also included a reduction in the Becher Street/1st Street intersection, concrete pavement, concrete sidewalks, integral curb and gutter, storm sewer, LED lighting, monotube traffic signals, and innovative elevated bike lanes. The intent of the project was to accommodate site changes for the River1 Development and improve safety for all users, pedestrians, bicyclists, and vehicles. By separating and elevating the bike lanes behind the curb line rather than placing them adjacent to the driving lanes, safety for pedestrians, bicyclists, and motorists will be enhanced. By implementing concepts from the National Association of City Transportation Officials (NATCO), Massachusetts Department of Transportation (MassDOT) Separated Bike Lane Planning and Design Guide and the Wisconsin Department of Transportation (WisDOT) Facilities Development Manual (FDM), this innovative design will be the first of its kind built in the City of Milwaukee. Construction will occur between April and July 2020, prior to the phase 1 opening of the River1 Development in the fall of 2020. Project Deliverables: • Preliminary and final plans • Detailed staging/traffic control • Storm sewer design • LED lighting system design • Raised/separated bike lane design with green markings • Pedestrian design with continental (zebra) crosswalks Project Gallery 1/1 < Previous Project Next Project >

  • ahmed-ali | Daar Engineering, Inc.

    Ahmed Ali Accounting Assistant ahmed.ali@daarcorp.com 414-935-4402 ​

  • I-94 N-S Freeway: Non-Interchange Segments | DAAR Engineering Inc

    I-94 N-S Freeway: Non-Interchange Segments Client Wisconsin Department of Transportation (SE Region) Location Racine County, WI Total Estimated Cost $180 Million DAAR provided final design services for the non-interchange segments and the WIS 11 interchange, as part of the 35-mile reconstruction of I-94 from the Illinois State Line to the Mitchell Interchange in Milwaukee, WI. The project included reconstruction of approximately 7 miles of interstate, 17 miles of frontage road and 2 miles of side roads. In addition, final design of 13 bridges, numerous retaining walls, box culvert extensions and sign bridges were required. Coordination with six consultant and WisDOT teams were a significant accomplishment in this project. In designing adjacent interchanges it was necessary to ensure that the match points created a continuous and cohesive project. Complex staging design was required to accommodate the reconstruction. This included coordination with numerous other mainline contracts in Racine, Kenosha and Milwaukee counties. Project Deliverables: • Final design plans of non-interchange segments • Project management Project Gallery 1/1 < Previous Project Next Project >

bottom of page