Freeway Design Projects

I-94 N-S Freeway: County KR Interchange
DAAR was selected to provide freeway design services for reconstruction of the I-94 and County KR interchange in Racine County, WI. This interchange was part of the 35-mile, I-94 North-South Freeway project from the Illinois State Line to the Mitchell Interchange in Milwaukee.

I-94 N-S Freeway: Non-Interchange Segments
DAAR provided final design services for the non-interchange segments and the WIS 11 interchange, as part of the 35-mile reconstruction of I-94 from the Illinois State Line to the Mitchell Interchange in Milwaukee, WI. The project included reconstruction of approximately 7 miles of interstate, 17 miles of frontage road and 2 miles of side roads. In addition, final design of 13 bridges, numerous retaining walls, box culvert extensions and sign bridges were required.

US 41 Corridor: Scheuring Road Interchange
As part of a design team, DAAR provided design services on this freeway expansion project. DAAR’s responsibilities included preliminary and final design of the County F (Scheuring Road) interchange. In addition to the interchange work, DAAR was responsible for 1.4 miles of the preliminary design of US 41 mainline.

