top of page

Search Results

214 items found for ""

  • October 2021 Anniversaries | DAAR Engineering Inc

    October 2021 Anniversaries ​ October 25, 2021 Shout out to our October Anniversaries!! ​ < Previous News Main News Next News >

  • Grand Avenue Bridge | DAAR Engineering Inc

    Grand Avenue Bridge ​ October 11, 2021 The Grand Avenue Bridge in the City of Wausau, originally constructed in 1964, was re-opened on schedule on Wednesday, September 22, 2021, after extensive repair/reconstruction. The bridge rehabilitation included 3 stages of concrete overlay, expansion joint replacement, and bridge girder painting. DAAR was honored to be part of this successful project. Over 23,000 vehicles per day utilize this critical piece of infrastructure in the heart of the city. We thank Mayor Rosenberg, her staff and the good people of Wausau for their patience and assistance. May they all enjoy using The Grand Avenue Bridge! < Previous News Main News Next News >

  • Water Management | DAAR Engineering Inc

    Water Management DAAR’s storm water management team has experience in both the public and private sectors and is well-versed in federal, state, and local regulations. Our team has completed numerous design projects including storm sewer design, overland storm water conveyance including bio-swales, detention and retention basin design, and infiltration basin design. We also have extensive experience in both the production and review of SLAMM analyses, and annual storm water plans. 1/3

  • samir-amin | Daar Engineering, Inc.

    Samir Amin, P.E. Global and Land Development Engineering Services Manager/Principal Samir.Amin@daarcorp.com 414-604-0674 Samir recently retired as the City Engineer of the City of Milwaukee. He is a strong engineering professional with over 36 years of experience. He has a successful history of working in government administration, having delivered major projects as well as overseeing day to day engineering activity in a major American city. Samir is skilled in Construction Management in addition to demonstrating excellence in decision-making, negotiation, creative problem-solving, communication, and leadership skills. Mr. Amin is a graduate of the University of Wisconsin, Milwaukee, with a bachelors degree (BS) and a Master of Engineering (M.Eng.) focused in Civil Engineering. He has been married to his wife Lorri for 37 years and has 6 adult children. Samir has resided in Milwaukee for the last 41 years.

  • jill-fehrman | Daar Engineering, Inc.

    Jill Fehrman Project Manager jill.fehrman@daarcorp.com 414-225-9817 ​

  • bob-sweigart | Daar Engineering, Inc.

    Bob Sweigart Engineering Technician robert.sweigart@daarcorp.com 414-935-4438 ​

  • Mount Tosa | DAAR Engineering Inc

    Mount Tosa Client Toldt Development Location Wauwatosa, WI Total Estimated Cost $2 Million Mount Tosa is a 430-unit multi-family development located at the extension of Walnut and 113th Streets. Multiple buildings with both public and private roadways and utility extensions were needed to develop the site. Both surface and underground parking were required to provide enough stalls for the density of the campus. The 19-acre site was formerly a quarry that was converted to a landfill and then reclaimed and converted to a clean earth landfill but was still considered a brownfield. The project had residual impacted soils which DAAR investigated and modified the concept plan to address. Soils had a high degree of variation and thus foundations systems required to be rammed aggregate pier installation to mitigate the risk. In addition, wetlands and extensive offsite drainage were present on the site and required careful coordination with the WI DNR. DAAR successfully created a plan which utilized the existing wetlands for stormwater management thus saving precious acres for the development. Project Deliverables • Concept planning • Rezoning maps • Impacted soils mapping and assessment • Unsuitable soils mapping and assessment • Wetlands delineations and concurrence letters • Preliminary and final engineering plans and supporting documents • Coordination with WI DNR and City on wetland and drainage features • Preliminary and final plats • Certified survey map • Acquisition of site approvals and permits • Acquisition of WI DNR permits • Construction administration • Construction staking • Record drawings Project Gallery 1/0 < Previous Project Next Project >

  • STH 82 | DAAR Engineering Inc

    STH 82 ​ May 10, 2021 It’s a nice day for construction on the STH 82 project in Adams County. Paving is underway on this six mile project that runs from CTH B to the Marquette County Line. DAAR is honored to be part of a great team. < Previous News Main News Next News >

  • CTH H | DAAR Engineering Inc

    CTH H ​ September 19, 2020 The CTH H Phase 2 project for the WisDOT Wisconn Valley Development Roads recently completed stage 1 construction. Great work by the WisDOT, DAAR, & Lakeside construction engineering team. < Previous News Main News Next News >

  • rhonda-lukasz | Daar Engineering, Inc.

    Rhonda Lukasz Design Administration rhonda.lukasz@daarcorp.com 414-935-4361 ​

  • stan-lukasz | Daar Engineering, Inc.

    Stan Lukasz, P.E. Design Services Manager/Principal stan.lukasz@daarcorp.com 414-935-4360 Stan is a skilled transportation engineer with extensive transportation engineering experience. He began his career with the Wisconsin Department of Transportation (WisDOT) in 1991 serving as Design Engineer, Construction Engineer and Project Manager. In February 2002, Stan joined DAAR to establish the DAAR Design Services Division at the original DAAR office located in Milwaukee, WI. In addition to serving as a Senior Design Project Manager for DAAR, he led a major contract effort serving as the Management Consultant (MC) Program Manager for the WisDOT SE Region Local Program from 2003-2018. Stan’s ability to think outside the box allowed him to significantly contribute to WisDOT design and construction procedures as he assisted in implementing new engineering standards and process improvements. Stan’s experience includes transportation programming, contracting, SDIC based public involvement, agency coordination and transportation infrastructure design. Stan is a certified WisDOT/NEPA document reviewer and registered Professional Engineer in the State of Wisconsin. He provides training and guidance on Americans with Disabilities Act (ADA) standards to industry and statewide stakeholders. His attention to detail, experience in transportation design and team leadership skills makes him an asset to the DAAR team and our public and private clients. Stan is a resident of West Bend, WI and works out of DAAR’s Milwaukee and Brookfield office locations. He is married with 4 adult children, enjoys travel and is a member of several rock bands in SE Wisconsin and Chicago.

  • Brookfield | DAAR Engineering Inc

    Brookfield Brookfield 13925 W North Ave Brookfield, WI 53005 1-414-225-9817 Monday: 08:00 am - 04:30 pm Tuesday: 08:00 am - 04:30 pm Wednesday: 08:00 am - 04:30 pm Thursday: 08:00 am - 04:30 pm Friday: 08:00 am - 04:30 pm Saturday: Closed Sunday: Closed

bottom of page