Your browser does not support JavaScript! Please check your browser settings for the best experience.

Wisconsin River Bridge Rehabilitation

The Wisconsin River Bridge rehabilitation project consists of bridge re-decking over the river on CTH WW in the Village of Brokaw in Marathon County, WI.

Construction Project Engineering services were provided for the B-37-0111 Wisconsin River Bridge rehabilitation project that replaced the bridge deck on a 580 foot four span continuous steel girder structure staged in halves to maintain regional connectivity for businesses, agriculture, and local traffic. Extensive coordination with local organizations, departments, businesses, and residents was positively executed throughout construction. The project was successfully completed on time and on budget with great teamwork and effort between the prime contractor, subcontractors, WisDOT, WisDNR, and DAAR. 

Project Deliverables:

  • Staged Bridge Construction
  • Challenging Work Space
  • Polymer Overlay
  • Public Coordination
  • Concrete Pavement
  • HMA Pavement
  • Guardrail 
  • Temporary Signals
  • Environmentally Sensitive Area