Your browser does not support JavaScript! Please check your browser settings for the best experience.

I-94 N-S Freeway: Non-Interchange Segments

DAAR provided final design services for the non-interchange segments and the STH 11 interchange, as part of the 35-mile reconstruction of I-94 from the Illinois State Line to the Mitchell Interchange in Milwaukee, WI. The project included reconstruction of approximately 7 miles of interstate, 17 miles of frontage road and 2 miles of side roads. In addition, final design of 13 bridges, numerous retaining walls, box culvert extensions and sign bridges were required.

The coordination elements of this project was among the greatest challenges in the successful completion of this project. Coordination with six consultant and WisDOT teams, which designed adjacent interchanges, was necessary to ensure that the match points created a continuous and cohesive project. Also, complex staging design was required to accomodate the reconstruction. This included coordination with numerous other mainline contracts in Racine, Kenosha and Milwaukee counties.

Project Deliverables:

  • Final design plans of non-interchange segments
  • Project management