Your browser does not support JavaScript! Please check your browser settings for the best experience.

I-894 Evaluation

In order to assist the Wisconsin Department of Transportation (WisDOT) in determining the best intersection signalization options, a simulation of the 27th Street Interchange was required.

Project Deliverables:

  • Preparation of I-894 Freeway Simulation Model
  • Utilization of CORSIM for Model
  • Preparation of 27th Street Interchange Signal Timing
  • Utilization of Synchro for Signal Timing
  • Adaptation into CORSIM Environment